Entries by Student

write my assignment 23225

Write 9 page essay on the topic Th Scond Globl Shft s Rloctng Clustrs n th Fnncl Industry n Europ.

ent economically and politically reigning over the world, but the rapidly emerging economic power of China and Japan is also an undeniable fact. which is the precursor of the second global shift. An emergence of competitors in the shape of China and Japan is adversely affecting the economic power of the USA. The resurgence of Asia especially East Asia is undoubtedly, the most significant global shift in the geography of the world economy during the past 40 years. (Dicken, 2007, p. 43)

Another very important fact is the complex geography of the product manufacturing process. “In other words, economic activity is becoming ‘deterritorialized’ or ‘disembedded’.” (Dicken, 2007, p. 18). For example, open boarders today allow some parts of the product being made in one country and it’s assembling being done in another. The purpose of this paper is to highlight the influence of the second global shift on the financial service industry, particularly the European financial services. Moreover, we will examine how this global shift will change the structure of financial groups in Europe.

The first global shift is the period of time when economic and political power was shifted from Britain and some European countries to the United States. This shift started occurring after the Second World War when United States appeared as a supreme economic and political power. After 1945 the world was dominated by two blocks i.e. the United States with its allies and the Soviet Union with its allies. This division was not only confined to economic differences but to socio-political differences as well. This is when the silent strain between the capitalist and the communist world began. “Hence, the world economic system that emerged after 1945 was, in many ways, a new beginning. It reflected both the new political realities of the post-war period – particularly the sharp division between East and West _ and also the harsh economic and social experiences of the

 

"Not answered?"


Get the Answer

write my assignment 4548

1. Explain one of the challenges of software internationalization discussed in Muller’s (2007) article. Suggest another challenge not discussed and how a software company might deal with it.- Müller, E. (2007, October). Measures to achieve quality in localization. MultiLingual, 18(7), 38-45.2. According to the Computer Weekly report (2007), why do software manufacturers not make software that is more robust? Do you agree with the report’s assertions and recommendations? Explain why or why not.- Improve reliability before adding features, Lords urge software firms. (2007, September 18). Computer Weekly, 10-10.In order for me to complete my own assignments I need these questions to be answered with at least 200 words.Looking for your superior response.Thanks,

 

"Not answered?"


Get the Answer

write my assignment 1343

You’re at the library to do research for your statistics project. You need 5 sources. There

are 7 finite mathematics sources and 11 statistics sources to choose from. Order doesn’t matter.

(a) How many ways can 5 sources be randomly selected out of the 18 sources? Show work.

(b) How many ways can 5 sources be chosen, if 2 must be finite math and 3 must be statistics?

Show work.

(c) Using your answers to parts (a) and (b), if 5 sources are randomly selected from the 18 sources, what is the probability that 2 are finite math and 3 are statistics? Round answer to nearest ten-thousandth (4 places after decimal). Show work.

 

"Not answered?"


Get the Answer

write my assignment 10499

11. Exercise 2-14 Computing Predetermined Overhead Rates and Job Costs [LO2-1, LO2-2, LO2-3, LO2-7]

Moody Corporation uses a job-order costing system with a plantwide overhead rate based on machine-hours. At the beginning of the year, the company made the following estimates:

      Machine-hours required to support estimated production 155,000   Fixed manufacturing overhead cost$654,000   Variable manufacturing overhead cost per machine-hour$4.60 

Required:1.Compute the predetermined overhead rate. (Do not round intermediate calculations. Round your answer to 2 decimal places.)

2.During the year, Job 400 was started and completed. The following information was available with respect to this job:

      Direct materials requisitioned$360   Direct labor cost$260   Machine-hours used 39 

 Compute the total manufacturing cost assigned to Job 400. (Do not round intermediate calculations and round final answer to 2 decimal places.)

(Use the overhead rate determined in requirement 1.)

 

"Not answered?"


Get the Answer