Answered>Order 785
The normal time for a work cycle in a worker-machine system is 6.27 min. For setting the standard time, the PFD allowance factor is 12%, and the machine allowance factor is 25%. The work cycle includes manual elements totaling a normal time of 5.92 min, all but 0.65 min of which are performed as internal […]